Inspections - City of Aledo, Illinois

Inspections are required for all permit projects.  The following is a partial list of required inspections. A complete list of inspection requirements is provided on or with each permit:

New 1 & 2 Family Residences and Additions

  • Underground drain, plumbing, electrical before covering same
  • Rough electrical
  • Rough plumbing
  • Rough HVAC
  • Rough carpentry
  • Final electrical
  • Final plumbi
  • Final HVAC
  • Final Occupancy
  • Pre-pour driveway, sidewalks

New Multi-Family, Commercial and Industrial buildings and additions

  • Same as for 1 & 2 family residences
  • Alternative inspection schedule may be agreed to for large projects
  • Elevator, detection and suppression tests are required and shall be witnessed


Building rehabilitation and fire repairs

  • All electrical, plumbing, HVAC and carpentry shall be inspected prior to covering same
  • Final occupancy inspection.

Change In Use Group

  • Rough Inspections: All electrical, plumbing, HVAC and carpentry shall be inspected prior to covering
  • Elevator, detection and suppression tests are required and shall be witnessed
  • Final occupancy inspection

Residential detached garages and sheds

  • Pre-pour inspection of foundation and slab after forms are installed, prior to pour
  • Final inspection after structure is complete, but before interior walls are covered

Fences

  • Posthole inspection after all postholes are dug, before concrete is poured
  • Final Inspection after fence is completed

Swimming pools

  • Pre-inspection after pool diameter is staked or flagged
  • Underground electrical (if applicable)
  • Final inspection after pool walls and electrical are completed, but prior to filling pool

Roofing

  • Rough: Call 24 hour notice prior to tear off
  • Final: Call for Final inspection after roof has been completed

Concrete, Asphalt (Streets, sidewalks, service walks, parking lots, etc.)

  • Prepour Inspection when forms/aggregate have been installed
  • Call for final after work is completed

General Plumbing, Electrical and HVAC

  • Rough: After materials, systems, etc. are installed, but prior to covering same
  • Final: After work has been completed